Colocation data center electrical build in Dallas

Industrial & manufacturing

MetroEdge Colocation Expansion

Location

Ashburn, VA

Duration

8 months

Duration

8 months

Year

2025

Year

2025

Market Size

145,000 SF

Client

StrataCore Digital Facilities

Crew

28+

Crew

28+

Delivery Method

CMAR

Delivery Method

CMAR

Capability

Mechanical & HVAC

Capability

Mechanical & HVAC

THE CHALLENGE

Delivering a high-density colocation suite while adjacent halls remained active for existing tenants. The project required tight coordination across switchgear, UPS rooms, chilled water loops, containment, and BMS integration with limited tolerance for schedule drift.

MetroEdge Colocation Expansion
MetroEdge Colocation Expansion

OUR APPROACH

Northgrid used prefabricated electrical racks, coordinated mechanical tie-ins through a shared BIM model, and staged material deliveries by white-space zone. Controls and commissioning teams validated equipment sequences before final integrated systems testing.

RESULTS

The expansion reached substantial completion ahead of tenant turnover. Commissioning documentation was accepted on first review, and the owner was able to begin tenant fit-out activities without delaying the next leasing milestone.

MetroEdge Colocation Expansion
MetroEdge Colocation Expansion
Colocation data center electrical build in Dallas

Industrial & manufacturing

MetroEdge Colocation Expansion

Location

Ashburn, VA

Duration

8 months

Year

2025

Market Size

145,000 SF

Client

StrataCore Digital Facilities

Crew

28+

Delivery Method

CMAR

Capability

Mechanical & HVAC

THE CHALLENGE

Delivering a high-density colocation suite while adjacent halls remained active for existing tenants. The project required tight coordination across switchgear, UPS rooms, chilled water loops, containment, and BMS integration with limited tolerance for schedule drift.

MetroEdge Colocation Expansion
MetroEdge Colocation Expansion

OUR APPROACH

Northgrid used prefabricated electrical racks, coordinated mechanical tie-ins through a shared BIM model, and staged material deliveries by white-space zone. Controls and commissioning teams validated equipment sequences before final integrated systems testing.

RESULTS

The expansion reached substantial completion ahead of tenant turnover. Commissioning documentation was accepted on first review, and the owner was able to begin tenant fit-out activities without delaying the next leasing milestone.

MetroEdge Colocation Expansion
MetroEdge Colocation Expansion

WORK WITH US

Ready for results like these?

© 2026 Northgrid MEP. All rights reserved.

Privacy · Terms · Trade partners

WORK WITH US

Ready for results like these?

© 2026 Northgrid MEP. All rights reserved.

Privacy · Terms · Trade partners

WORK WITH US

Ready for results like these?